Borehole Deviation

The MDL Logo Boretrack® system is used by TEC to measure actual drilling deviation at all locations in the drill hole.  This information can be used to:

  • control front row burdens for blasting
  • reduce airblast
  • reduce ground vibration
  • better control oversize

The results are provided in the form of bull's-eye and cross-sectional plots, analysis, and recommendations.